Tactical DrywallBillings, Montana Call or text(406) 855-5344 Get My Drywall Bid

Process Part 2

Before we arrive.

Your part Before we arrive

Five things that help.

  1. Clear the work area of furniture and anything on the walls, or let us know what needs moving.
  2. Plan on the HVAC being off, or its returns sealed, during sanding days. We'll tell you which days.
  3. Keep pets and kids out of the work area. Mud buckets and stilts don't mix with either.
  4. In winter, keep the heat on. Mud needs a warm room to dry right.
  5. Tell us about access: lockbox, parking, gate codes, quiet hours.

Dust How we keep it contained

Drywall is dusty. Your house doesn't have to be.

  • Plastic barriers with zipper doors at the work area
  • Floor protection on the path in and in the room
  • Returns and vents sealed during sanding
  • Sanding methods that capture dust at the source wherever practical
  • Daily cleanup, and a full vacuum at the end

Timing Rough guide

How long does it take?

Rough numbers for planning. Your written scope has the real dates. Cold, humid or unheated spaces take longer.

Typical drywall job durations
JobVisits / time on siteWhy
One roomSeveral working daysHang, three coats with drying time, sand, texture
Level 5 roomsAdd time for the skim coatOne more coat over everything, plus drying
PaintAfter texture is dryPrimer, then finish coats
New house or commercialPer the builder's scheduleSquare footage, finish level and heat drive it